Carver County is leading two major improvement projects in the Victoria Commercial Area, one along Highway 11 and one along Highway 10.

Open House Resources

View resources and summaries from open house events below. 

July 2026 Open House

A second open house was held on July 14, 2026 at the Chaska Community Center - The Lodge to share the latest planned safety and traffic improvements in the project area.

View the open house display boards from July 14.

Take the Highway 10 Improvements Public Survey online.

February 2026 Open House

An open house was held on Feb. 12, 2026, at Westbrook Community Church Community to share planned safety and traffic improvements in the project area.

More than 120 attendees connected directly with the project design team, reviewed potential improvements, learned about the anticipated schedule, and shared feedback.

View the open house display boards from Feb. 12.

Highway 10 Project 

The Highway 10 project extends from west of Highway 43 to West Creek Lane. The work focuses on improving safety, enhancing intersections, expanding the trail network, and upgrading infrastructure.

Project Benefits

  • Improved safety for all users through a realignment west of the railroad crossing.
  • Safety enhancements at the Highway 43 West, Highway 43 East, and Highway 11 intersections.
  • Better pedestrian and bicyclist mobility with an expanded trail network, including a trail extension along Highway 10.
  • Reduced traffic congestion.
  • Roadway reconstruction and stormwater system replacement.
  • Strategic removal of roadside obstacles to improve the clear zone.

Highway 11 Project

The Highway 11 project runs from south of Guernsey Avenue to north of the railroad crossing. Supported by Metropolitan Council Regional Solicitation – Spot Mobility and Safety funding, the project aims to improve safety, upgrade the Highway 10 & 11 intersection, extend the trail network, and modernize infrastructure.

Project Benefits

  • Increased safety, mobility, and capacity through improvements at the Highway 10 and 11 intersection.
  • Better pedestrian and bicyclist mobility with new trail connections linking the City of Carver to the Huntersbrook development.
  • Reduced traffic congestion.
  • Roadway reconstruction and stormwater system replacement.
  • Strategic removal of roadside obstacles to improve the clear zone.

Both projects will require right-of-way acquisition. Impacted property owners will be contacted directly by Carver County staff as design work advances. Construction is anticipated to begin in 2028 for Highway 11 and in 2029 for Highway 10.

A corridor study will also be conducted on Highway 43 to evaluate a potential realignment from Hampshire Road to the west leg of Highway 43.

Highway 10 Corridor Study

The Highway 10 Corridor Study, conducted from 2018 to 2021, identified long-term improvements to support safety, mobility, and regional transportation needs between Highway 43 in Laketown Township and Highway 61 in Chaska.

Study recommendations include infrastructure upgrades, trail expansions, and a phased implementation plan. 

View Highway 10 Corridor Study details.