The following bridge projects are currently in the final design phase and are planned for construction in 2026 to improve safety, durability, and long-term infrastructure performance.
150th Street Bridge Project
This project will replace the existing bridge with a new concrete bridge crossing on 150th Street. The project location is approximately 600 to 1,000 feet east of Highway 51, where the roadway crosses Bevens Creek in Benton Township.
Maplewood Road Bridge Project
This project includes replacement of the existing bridge with a new concrete bridge on Maplewood Road. The crossing is located approximately 650 to 1,050 feet east of Maplewood Lane over Bevens Creek in Dahlgren Township.
42nd Street Bridge Project
This project will replace the existing bridge with a new concrete box culvert crossing on 42nd Street over a stream in Hollywood Township.